3Design Architect
Home Gallery About News Services Contact
 

  Step 1 Data Gathering
  Step 2 3D Modelling
  Step 3 Texturing & Lighting
  Step 4 Rendering & Delivery
   



 
Step 2 3D Modelling Stage
  All infomation received, it is now the time to create a full 3d model using 3d softwares.
 

The whole modelling process usually takes about 1-3 days depending on the complexity of the design and the amount of details required.
On a very simple design, however, the whole modelling could be done in just a few hours time. Large urban scale projects with a lot of detail can take up to
8-10 days to finish.

  Below are some screenshot samples of completed 3d model built based on the one-line sketch drawing on Step 1
 
 

Isometric Finished 3d model

Elevation Mode


Note


Sometimes there are a number of non-architectural entourage / additional elements that needs to be modelled to be part of the finished image. These items, such as : specific types of furnitures, plants, other appliances also need to be modelled.
These other elements are very important, especially on interior images. Early information regarding these elements will help speed up the modelling process.

 

Previous Step : Data Gathering

 

 


Adobe Flash Player 9
© or above is needed to view the images on this website,
Please click here to get latest Adobe Flash player, or here to go to our previous HTML site.
All images are copyright of 3DA and its clients, no unauthorized copy of the images may be used without permission

Copyright © 2006 3DesignArchitect